River Forecast
Issued by NWS

Home |  Current Version |  Previous Version |  Text Only |  Print | Product List |  Glossary On
Versions: 1 2
973
FGUS53 KMSR 031603
RVFILO

RIVER FORECAST
NATIONAL WEATHER SERVICE
NWS NORTH CENTRAL RIVER FORECAST CENTER; CHANHASSEN MN
1102 AM CDT THU APR 03 2025

: THIS IS A NWS GUIDANCE PRODUCT FROM THE NORTH CENTRAL RIVER
: FORECAST CENTER.  PUBLIC FORECASTS AND WARNINGS ARE ISSUED BY NWS
: WEATHER FORECAST OFFICES.
:
: FORECAST GROUP IS ILO
:
: FORECASTS INCLUDE 72-HOURS OF FUTURE PRECIPITATION (QPF) IN 6 HOUR INCREMENTS
:
:************************************************************
:ILLINOIS RIVER, MORI2
:MORRIS, IL - LOT
:
:ACTION STAGE      13.0 FTMINOR STAGE       16.0 FT
:MODERATE STAGE    18.0 FTMAJOR STAGE       22.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 11.2 FT AT 1200 Z ON APR 03
.AR :CREST: MORI2 0406 Z DC202504031602/DH1200/HGIFFXZ 14.5
:Crest near 14.5 FT around 12 Z on Sun, Apr 6
.ER MORI2 0403 Z DC202504031602/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0403 :           /  11.4 /  11.7 /  11.6
.E2    : 0404 :   /  11.3 /  11.0 /  10.8 /  10.9
.E3    : 0405 :   /  11.2 /  11.9 /  13.0 /  14.0
.E4    : 0406 :   /  14.5 /  14.5 /  14.3 /  14.0
.E5    : 0407 :   /  13.6 /  13.2 /  12.9 /  12.6
.E6    : 0408 :   /  12.4 /  12.2 /  11.9 /  11.7
.E7    : 0409 :   /  11.4 /  11.1 /  10.8 /  10.5
.E8    : 0410 :   /  10.2
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0403            /  0.00 /  0.00 /  0.00
: 0404    /  0.00 /  0.00 /  0.22 /  0.43
: 0405    /  0.14 /  0.02 /  0.03 /  0.02
: 0406    /  0.00
:
: 72-hr QPF Total Ending on Apr 06 is 0.86 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, MMOI2
:MARSEILLES L&D 2W, IL - LOT
:
:ACTION STAGE     466.0 FTMINOR STAGE      467.0 FT
:MODERATE STAGE   469.5 FTMAJOR STAGE      473.0 FT
:
:THE ESTIMATED TAILWATER STAGE WAS 462.1 FT AT 1200 Z ON APR 03
.ER MMOI2 0403 Z DC202504031602/DH18/HTIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0403 :           / 462.4 / 462.6 / 462.6
.E2    : 0404 :   / 462.4 / 462.2 / 462.0 / 462.1
.E3    : 0405 :   / 462.3 / 462.8 / 463.5 / 464.1
.E4    : 0406 :   / 464.4 / 464.4 / 464.3 / 464.2
.E5    : 0407 :   / 464.0 / 463.8 / 463.6 / 463.5
.E6    : 0408 :   / 463.3 / 463.2 / 463.1 / 462.9
.E7    : 0409 :   / 462.8 / 462.6 / 462.4 / 462.1
.E8    : 0410 :   / 461.9
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0403            /  0.00 /  0.00 /  0.00
: 0404    /  0.00 /  0.00 /  0.24 /  0.39
: 0405    /  0.13 /  0.02 /  0.03 /  0.01
: 0406    /  0.00
:
: 72-hr QPF Total Ending on Apr 06 is 0.82 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, OTWI2
:OTTAWA, IL - LOT
:
:ACTION STAGE     461.0 FTMINOR STAGE      463.0 FT
:MODERATE STAGE   467.0 FTMAJOR STAGE      471.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 461.0 FT AT 1200 Z ON APR 03
.AR :CREST: OTWI2 0406 Z DC202504031602/DH1800/HGIFFXZ 463.0
:Crest near 463.0 FT around 18 Z on Sun, Apr 6
.ER OTWI2 0403 Z DC202504031602/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0403 :           / 461.3 / 461.4 / 461.5
.E2    : 0404 :   / 461.5 / 461.4 / 461.3 / 461.3
.E3    : 0405 :   / 461.5 / 461.7 / 462.0 / 462.5
.E4    : 0406 :   / 462.8 / 463.0 / 463.0 / 462.9
.E5    : 0407 :   / 462.8 / 462.7 / 462.6 / 462.5
.E6    : 0408 :   / 462.3 / 462.2 / 462.0 / 461.9
.E7    : 0409 :   / 461.7 / 461.5 / 461.3 / 461.1
.E8    : 0410 :   / 461.0
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0403            /  0.00 /  0.00 /  0.00
: 0404    /  0.00 /  0.00 /  0.26 /  0.31
: 0405    /  0.12 /  0.02 /  0.02 /  0.00
: 0406    /  0.00
:
: 72-hr QPF Total Ending on Apr 06 is 0.73 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, SRDI2
:UTICA-STARVED ROCK L&D 6, IL - LOT
:
:ACTION STAGE     449.0 FTMINOR STAGE      450.0 FT
:MODERATE STAGE   460.0 FTMAJOR STAGE      465.0 FT
:
:THE ESTIMATED TAILWATER STAGE WAS 447.6 FT AT 1200 Z ON APR 03
:RISE ABOVE FLOOD STAGE AROUND 21 Z ON 04/03/2025
.AR :CREST: SRDI2 0407 Z DC202504031602/DH0000/HTIFFXZ 453.5
:Crest near 453.5 FT around 00 Z on Mon, Apr 7
.ER SRDI2 0403 Z DC202504031602/DH18/HTIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0403 :           / 449.5 / 450.2 / 450.5
.E2    : 0404 :   / 450.7 / 450.7 / 450.6 / 450.5
.E3    : 0405 :   / 450.5 / 450.7 / 451.3 / 452.0
.E4    : 0406 :   / 452.8 / 453.3 / 453.5 / 453.5
.E5    : 0407 :   / 453.4 / 453.2 / 453.1 / 452.8
.E6    : 0408 :   / 452.8 / 452.3 / 452.2 / 451.9
.E7    : 0409 :   / 451.8 / 451.6 / 451.4 / 451.2
.E8    : 0410 :   / 451.0
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0403            /  0.00 /  0.00 /  0.00
: 0404    /  0.00 /  0.00 /  0.26 /  0.31
: 0405    /  0.12 /  0.02 /  0.02 /  0.00
: 0406    /  0.00
:
: 72-hr QPF Total Ending on Apr 06 is 0.73 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, LSLI2
:LA SALLE 1S, IL - LOT
:
:ACTION STAGE      19.0 FTMINOR STAGE       20.0 FT
:MODERATE STAGE    27.0 FTMAJOR STAGE       31.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 16.6 FT AT 1200 Z ON APR 03
:RISE ABOVE FLOOD STAGE AROUND 21 Z ON 04/05/2025
.AR :CREST: LSLI2 0407 Z DC202504031602/DH0600/HGIFFXZ 22.6
:Crest near 22.6 FT around 06 Z on Mon, Apr 7
.ER LSLI2 0403 Z DC202504031602/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0403 :           /  18.5 /  19.2 /  19.7
.E2    : 0404 :   /  19.8 /  19.8 /  19.7 /  19.6
.E3    : 0405 :   /  19.6 /  19.7 /  20.1 /  20.8
.E4    : 0406 :   /  21.5 /  22.2 /  22.5 /  22.6
.E5    : 0407 :   /  22.6 /  22.5 /  22.4 /  22.3
.E6    : 0408 :   /  22.1 /  21.9 /  21.7 /  21.5
.E7    : 0409 :   /  21.2 /  21.0 /  20.8 /  20.5
.E8    : 0410 :   /  20.2
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0403            /  0.00 /  0.00 /  0.00
: 0404    /  0.00 /  0.00 /  0.24 /  0.23
: 0405    /  0.11 /  0.01 /  0.01 /  0.00
: 0406    /  0.00
:
: 72-hr QPF Total Ending on Apr 06 is 0.60 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, HNYI2
:HENRY, IL - ILX
:
:ACTION STAGE      22.0 FTMINOR STAGE       23.0 FT
:MODERATE STAGE    24.0 FTMAJOR STAGE       31.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 16.1 FT AT 1200 Z ON APR 03
:RISE ABOVE FLOOD STAGE AROUND 00 Z ON 04/08/2025
.AR :CREST: HNYI2 0408 Z DC202504031602/DH1200/HGIFFXZ 23.2
:Crest near 23.2 FT around 12 Z on Tue, Apr 8
:FALL BELOW FLOOD STAGE AROUND 18 Z ON 04/09/2025
.ER HNYI2 0403 Z DC202504031602/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0403 :           /  16.4 /  16.8 /  17.3
.E2    : 0404 :   /  18.3 /  19.2 /  19.8 /  20.1
.E3    : 0405 :   /  20.3 /  20.4 /  20.6 /  20.7
.E4    : 0406 :   /  21.0 /  21.5 /  21.9 /  22.3
.E5    : 0407 :   /  22.5 /  22.8 /  23.0 /  23.1
.E6    : 0408 :   /  23.2 /  23.2 /  23.2 /  23.1
.E7    : 0409 :   /  23.1 /  23.0 /  22.8 /  22.7
.E8    : 0410 :   /  22.6
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0403            /  0.00 /  0.00 /  0.00
: 0404    /  0.00 /  0.00 /  0.26 /  0.19
: 0405    /  0.09 /  0.01 /  0.01 /  0.00
: 0406    /  0.00
:
: 72-hr QPF Total Ending on Apr 06 is 0.56 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, PIAI2
:PEORIA - BOAT YARD, IL - ILX
:
:ACTION STAGE      17.0 FTMINOR STAGE       18.0 FT
:MODERATE STAGE    22.0 FTMAJOR STAGE       28.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 12.1 FT AT 1200 Z ON APR 03
:RISE ABOVE FLOOD STAGE AROUND 03 Z ON 04/08/2025
.AR :CREST: PIAI2 0409 Z DC202504031602/DH0600/HGIFFXZ 19.0
:Crest near 19.0 FT around 06 Z on Wed, Apr 9
.ER PIAI2 0403 Z DC202504031602/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0403 :           /  12.1 /  12.2 /  12.4
.E2    : 0404 :   /  12.6 /  12.7 /  12.9 /  13.1
.E3    : 0405 :   /  13.6 /  14.2 /  14.5 /  14.8
.E4    : 0406 :   /  15.0 /  15.2 /  15.5 /  15.9
.E5    : 0407 :   /  16.5 /  17.1 /  17.7 /  18.2
.E6    : 0408 :   /  18.5 /  18.7 /  18.9 /  19.0
.E7    : 0409 :   /  19.0 /  19.0 /  19.0 /  19.0
.E8    : 0410 :   /  18.9
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0403            /  0.00 /  0.00 /  0.00
: 0404    /  0.00 /  0.00 /  0.33 /  0.33
: 0405    /  0.11 /  0.02 /  0.03 /  0.01
: 0406    /  0.00
:
: 72-hr QPF Total Ending on Apr 06 is 0.83 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, PRAI2
:PEORIA 5SSW - L&D 7, IL - ILX
:
:ACTION STAGE     444.0 FTMINOR STAGE      447.0 FT
:MODERATE STAGE   449.0 FTMAJOR STAGE      455.0 FT
:
:THE ESTIMATED TAILWATER STAGE WAS 436.0 FT AT 1200 Z ON APR 03
.AR :CREST: PRAI2 0409 Z DC202504031602/DH1200/HTIFFXZ 446.5
:Crest near 446.5 FT around 12 Z on Wed, Apr 9
.ER PRAI2 0403 Z DC202504031602/DH18/HTIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0403 :           / 436.1 / 436.3 / 436.4
.E2    : 0404 :   / 436.8 / 438.5 / 439.4 / 440.0
.E3    : 0405 :   / 440.5 / 441.1 / 441.5 / 441.9
.E4    : 0406 :   / 442.3 / 442.6 / 442.8 / 443.2
.E5    : 0407 :   / 443.5 / 444.1 / 444.6 / 445.3
.E6    : 0408 :   / 445.7 / 446.0 / 446.2 / 446.4
.E7    : 0409 :   / 446.5 / 446.5 / 446.5 / 446.5
.E8    : 0410 :   / 446.4
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0403            /  0.00 /  0.00 /  0.00
: 0404    /  0.00 /  0.00 /  0.35 /  0.34
: 0405    /  0.09 /  0.03 /  0.04 /  0.01
: 0406    /  0.00
:
: 72-hr QPF Total Ending on Apr 06 is 0.86 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, HAVI2
:HAVANA , IL - ILX
:
:ACTION STAGE      13.0 FTMINOR STAGE       14.0 FT
:MODERATE STAGE    17.0 FTMAJOR STAGE       23.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 8.9 FT AT 1200 Z ON APR 03
:RISE ABOVE FLOOD STAGE AROUND 09 Z ON 04/06/2025
.AR :CREST: HAVI2 0410 Z DC202504031602/DH0600/HGIFFXZ 18.0
:Crest near 18.0 FT around 06 Z on Thu, Apr 10
.ER HAVI2 0403 Z DC202504031602/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0403 :           /   9.0 /   9.0 /   9.1
.E2    : 0404 :   /   9.3 /  10.0 /  11.1 /  11.9
.E3    : 0405 :   /  12.5 /  13.0 /  13.5 /  13.9
.E4    : 0406 :   /  14.2 /  14.5 /  14.8 /  15.0
.E5    : 0407 :   /  15.2 /  15.5 /  15.8 /  16.2
.E6    : 0408 :   /  16.6 /  17.1 /  17.5 /  17.7
.E7    : 0409 :   /  17.8 /  17.9 /  17.9 /  18.0
.E8    : 0410 :   /  18.0
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0403            /  0.00 /  0.00 /  0.01
: 0404    /  0.00 /  0.01 /  0.42 /  0.40
: 0405    /  0.08 /  0.03 /  0.07 /  0.02
: 0406    /  0.00
:
: 72-hr QPF Total Ending on Apr 06 is 1.04 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, BEAI2
:BEARDSTOWN, IL - ILX
:
:ACTION STAGE      13.0 FTMINOR STAGE       14.0 FT
:MODERATE STAGE    18.0 FTMAJOR STAGE       28.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 9.4 FT AT 1200 Z ON APR 03
:RISE ABOVE FLOOD STAGE AROUND 21 Z ON 04/06/2025
.ER BEAI2 0403 Z DC202504031602/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0403 :           /   9.6 /   9.7 /   9.8
.E2    : 0404 :   /   9.8 /  10.0 /  10.2 /  10.3
.E3    : 0405 :   /  10.4 /  10.9 /  11.5 /  12.2
.E4    : 0406 :   /  12.8 /  13.6 /  14.2 /  14.8
.E5    : 0407 :   /  15.2 /  15.5 /  15.8 /  16.1
.E6    : 0408 :   /  16.4 /  16.7 /  16.9 /  17.1
.E7    : 0409 :   /  17.4 /  17.7 /  18.0 /  18.3
.E8    : 0410 :   /  18.7
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0403            /  0.00 /  0.00 /  0.01
: 0404    /  0.01 /  0.01 /  0.44 /  0.42
: 0405    /  0.07 /  0.06 /  0.09 /  0.02
: 0406    /  0.00
:
: 72-hr QPF Total Ending on Apr 06 is 1.13 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, NLGI2
:LA GRANGE L&D 8, IL - LSX
:
:ACTION STAGE      21.0 FTMINOR STAGE       23.0 FT
:MODERATE STAGE    27.0 FTMAJOR STAGE       29.0 FT
:
:THE ESTIMATED TAILWATER STAGE WAS 12.0 FT AT 1200 Z ON APR 03
.ER NLGI2 0403 Z DC202504031602/DH18/HTIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0403 :           /  12.1 /  12.2 /  12.3
.E2    : 0404 :   /  12.4 /  12.5 /  12.6 /  13.9
.E3    : 0405 :   /  14.9 /  15.9 /  16.6 /  17.3
.E4    : 0406 :   /  18.0 /  18.5 /  19.0 /  19.5
.E5    : 0407 :   /  20.0 /  20.3 /  20.6 /  20.8
.E6    : 0408 :   /  21.0 /  21.2 /  21.4 /  21.6
.E7    : 0409 :   /  21.8 /  22.0 /  22.2 /  22.3
.E8    : 0410 :   /  22.5
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0403            /  0.00 /  0.00 /  0.01
: 0404    /  0.01 /  0.01 /  0.45 /  0.41
: 0405    /  0.05 /  0.06 /  0.09 /  0.02
: 0406    /  0.00
:
: 72-hr QPF Total Ending on Apr 06 is 1.11 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, MROI2
:MEREDOSIA PWR PLANT, IL - LSX
:
:ACTION STAGE      14.0 FTMINOR STAGE       17.0 FT
:MODERATE STAGE    22.0 FTMAJOR STAGE       24.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 6.6 FT AT 1200 Z ON APR 03
.ER MROI2 0403 Z DC202504031602/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0403 :           /   6.7 /   6.8 /   6.8
.E2    : 0404 :   /   6.9 /   7.0 /   7.2 /   8.0
.E3    : 0405 :   /   8.8 /   9.7 /  10.7 /  11.5
.E4    : 0406 :   /  12.2 /  12.7 /  13.0 /  13.2
.E5    : 0407 :   /  13.4 /  13.7 /  13.9 /  14.2
.E6    : 0408 :   /  14.4 /  14.5 /  14.8 /  15.0
.E7    : 0409 :   /  15.2 /  15.4 /  15.6 /  15.7
.E8    : 0410 :   /  15.8
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0403            /  0.00 /  0.01 /  0.01
: 0404    /  0.01 /  0.01 /  0.48 /  0.55
: 0405    /  0.08 /  0.09 /  0.14 /  0.02
: 0406    /  0.00
:
: 72-hr QPF Total Ending on Apr 06 is 1.40 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, VALI2
:VALLEY CITY, IL - LSX
:
:ACTION STAGE      11.0 FTMINOR STAGE       14.0 FT
:MODERATE STAGE    21.0 FTMAJOR STAGE       23.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 5.5 FT AT 1200 Z ON APR 03
.ER VALI2 0403 Z DC202504031602/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0403 :           /   5.5 /   5.6 /   5.6
.E2    : 0404 :   /   5.7 /   5.7 /   5.8 /   6.1
.E3    : 0405 :   /   6.8 /   7.9 /   8.7 /   9.7
.E4    : 0406 :   /  10.4 /  10.9 /  11.2 /  11.5
.E5    : 0407 :   /  11.8 /  12.0 /  12.2 /  12.4
.E6    : 0408 :   /  12.5 /  12.7 /  12.9 /  13.0
.E7    : 0409 :   /  13.1 /  13.3 /  13.5 /  13.6
.E8    : 0410 :   /  13.7
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0403            /  0.00 /  0.02 /  0.02
: 0404    /  0.01 /  0.02 /  0.50 /  0.58
: 0405    /  0.08 /  0.10 /  0.15 /  0.02
: 0406    /  0.00
:
: 72-hr QPF Total Ending on Apr 06 is 1.50 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, HARI2
:HARDIN, IL - LSX
:
:ACTION STAGE      24.0 FTMINOR STAGE       25.0 FT
:MODERATE STAGE    31.0 FTMAJOR STAGE       32.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 20.4 FT AT 1200 Z ON APR 03
.ER HARI2 0403 Z DC202504031602/DH18/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0403 :           /  20.4 /  20.5 /  20.5
.E2    : 0404 :   /  20.6 /  20.6 /  20.6 /  20.7
.E3    : 0405 :   /  21.1 /  21.7 /  22.3 /  22.9
.E4    : 0406 :   /  23.5 /  23.8 /  23.9 /  24.0
.E5    : 0407 :   /  24.0 /  24.1 /  24.1 /  24.1
.E6    : 0408 :   /  24.1 /  24.1 /  24.1 /  24.1
.E7    : 0409 :   /  24.2 /  24.2 /  24.2 /  24.3
.E8    : 0410 :   /  24.3
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0403            /  0.00 /  0.06 /  0.07
: 0404    /  0.02 /  0.05 /  0.53 /  0.76
: 0405    /  0.11 /  0.16 /  0.18 /  0.03
: 0406    /  0.01
:
: 72-hr QPF Total Ending on Apr 06 is 1.98 inches
:
:FORECASTER COMMENTS...
:
:
:
:*******************************************************************
:
$$
:
FCSTR EXT: 2533
:
:...END of MESSAGE...