River Forecast
Issued by NWS

Home |  Current Version |  Previous Version |  Text Only |  Print | Product List |  Glossary On
Versions: 1 2
175
FGUS53 KMSR 010107
RVFILO

RIVER FORECAST
NATIONAL WEATHER SERVICE
NWS NORTH CENTRAL RIVER FORECAST CENTER; CHANHASSEN MN
807 PM CDT SUN AUG 31 2025

: THIS IS A NWS GUIDANCE PRODUCT FROM THE NORTH CENTRAL RIVER
: FORECAST CENTER.  PUBLIC FORECASTS AND WARNINGS ARE ISSUED BY NWS
: WEATHER FORECAST OFFICES.
:
: FORECAST GROUP IS ILO
:
: FORECASTS INCLUDE 24-HOURS OF FUTURE PRECIPITATION (QPF) IN 6 HOUR INCREMENTS
:
:************************************************************
:ILLINOIS RIVER, MORI2
:MORRIS, IL - LOT
:
:ACTION STAGE      13.0 FTMINOR STAGE       16.0 FT
:MODERATE STAGE    18.0 FTMAJOR STAGE       22.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 4.9 FT AT 0000 Z ON SEP 01
.ER MORI2 0901 Z DC202509010107/DH06/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :                           /   4.9
.E2    : 0901 :   /   5.0 /   5.0 /   5.0 /   4.9
.E3    : 0902 :   /   4.9 /   4.9 /   4.9 /   5.0
.E4    : 0903 :   /   5.0 /   5.0 /   4.9 /   4.9
.E5    : 0904 :   /   4.9 /   4.9 /   4.9 /   4.9
.E6    : 0905 :   /   4.9 /   4.9 /   4.9 /   4.9
.E7    : 0906 :   /   4.9 /   4.9 /   4.9 /   4.9
.E8    : 0907 :   /   4.9 /   4.9 /   4.9
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831                            /  0.00
: 0901    /  0.00 /  0.00 /  0.00
:
: 24-hr QPF Total Ending on Sep 02 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, LSLI2
:LA SALLE 1S, IL - LOT
:
:ACTION STAGE      19.0 FTMINOR STAGE       20.0 FT
:MODERATE STAGE    27.0 FTMAJOR STAGE       31.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 11.1 FT AT 0000 Z ON SEP 01
.ER LSLI2 0901 Z DC202509010107/DH06/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :                           /  11.0
.E2    : 0901 :   /  10.9 /  10.9 /  10.8 /  10.8
.E3    : 0902 :   /  10.8 /  10.8 /  10.8 /  10.8
.E4    : 0903 :   /  10.8 /  10.8 /  10.8 /  10.8
.E5    : 0904 :   /  10.8 /  10.8 /  10.8 /  10.8
.E6    : 0905 :   /  10.8 /  10.7 /  10.7 /  10.7
.E7    : 0906 :   /  10.7 /  10.7 /  10.7 /  10.7
.E8    : 0907 :   /  10.7 /  10.7 /  10.7
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831                            /  0.00
: 0901    /  0.00 /  0.00 /  0.00
:
: 24-hr QPF Total Ending on Sep 02 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, HNYI2
:HENRY, IL - ILX
:
:ACTION STAGE      22.0 FTMINOR STAGE       23.0 FT
:MODERATE STAGE    24.0 FTMAJOR STAGE       31.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 14.5 FT AT 0000 Z ON SEP 01
.ER HNYI2 0901 Z DC202509010107/DH06/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :                           /  14.5
.E2    : 0901 :   /  14.5 /  14.5 /  14.5 /  14.5
.E3    : 0902 :   /  14.5 /  14.5 /  14.5 /  14.5
.E4    : 0903 :   /  14.5 /  14.5 /  14.5 /  14.5
.E5    : 0904 :   /  14.5 /  14.5 /  14.5 /  14.5
.E6    : 0905 :   /  14.5 /  14.5 /  14.5 /  14.5
.E7    : 0906 :   /  14.5 /  14.5 /  14.5 /  14.5
.E8    : 0907 :   /  14.5 /  14.5 /  14.5
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831                            /  0.00
: 0901    /  0.00 /  0.00 /  0.00
:
: 24-hr QPF Total Ending on Sep 02 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, PIAI2
:PEORIA - BOAT YARD, IL - ILX
:
:ACTION STAGE      17.0 FTMINOR STAGE       18.0 FT
:MODERATE STAGE    22.0 FTMAJOR STAGE       28.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 11.9 FT AT 0000 Z ON SEP 01
.ER PIAI2 0901 Z DC202509010107/DH06/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :                           /  11.9
.E2    : 0901 :   /  11.9 /  11.9 /  11.9 /  11.9
.E3    : 0902 :   /  11.9 /  11.9 /  11.9 /  11.9
.E4    : 0903 :   /  11.9 /  11.9 /  11.9 /  11.9
.E5    : 0904 :   /  11.9 /  11.9 /  11.9 /  11.9
.E6    : 0905 :   /  11.9 /  11.9 /  11.9 /  11.9
.E7    : 0906 :   /  11.9 /  11.9 /  11.8 /  11.8
.E8    : 0907 :   /  11.8 /  11.8 /  11.8
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831                            /  0.00
: 0901    /  0.00 /  0.00 /  0.00
:
: 24-hr QPF Total Ending on Sep 02 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, HAVI2
:HAVANA , IL - ILX
:
:ACTION STAGE      13.0 FTMINOR STAGE       14.0 FT
:MODERATE STAGE    17.0 FTMAJOR STAGE       23.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 6.2 FT AT 0000 Z ON SEP 01
.ER HAVI2 0901 Z DC202509010107/DH06/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :                           /   6.1
.E2    : 0901 :   /   6.0 /   5.9 /   5.8 /   5.8
.E3    : 0902 :   /   5.7 /   5.7 /   5.7 /   5.6
.E4    : 0903 :   /   5.6 /   5.6 /   5.5 /   5.5
.E5    : 0904 :   /   5.5 /   5.5 /   5.5 /   5.4
.E6    : 0905 :   /   5.4 /   5.4 /   5.4 /   5.4
.E7    : 0906 :   /   5.3 /   5.3 /   5.3 /   5.3
.E8    : 0907 :   /   5.3 /   5.3 /   5.3
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831                            /  0.00
: 0901    /  0.00 /  0.00 /  0.00
:
: 24-hr QPF Total Ending on Sep 02 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, BEAI2
:BEARDSTOWN, IL - ILX
:
:ACTION STAGE      13.0 FTMINOR STAGE       14.0 FT
:MODERATE STAGE    18.0 FTMAJOR STAGE       28.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 9.6 FT AT 0000 Z ON SEP 01
.ER BEAI2 0901 Z DC202509010107/DH06/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :                           /   9.6
.E2    : 0901 :   /   9.6 /   9.6 /   9.5 /   9.5
.E3    : 0902 :   /   9.5 /   9.5 /   9.5 /   9.4
.E4    : 0903 :   /   9.4 /   9.4 /   9.4 /   9.3
.E5    : 0904 :   /   9.3 /   9.3 /   9.3 /   9.3
.E6    : 0905 :   /   9.3 /   9.3 /   9.3 /   9.3
.E7    : 0906 :   /   9.3 /   9.3 /   9.3 /   9.3
.E8    : 0907 :   /   9.3 /   9.3 /   9.3
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831                            /  0.00
: 0901    /  0.00 /  0.00 /  0.00
:
: 24-hr QPF Total Ending on Sep 02 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, MROI2
:MEREDOSIA PWR PLANT, IL - LSX
:
:ACTION STAGE      14.0 FTMINOR STAGE       17.0 FT
:MODERATE STAGE    22.0 FTMAJOR STAGE       24.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 3.5 FT AT 0000 Z ON SEP 01
.ER MROI2 0901 Z DC202509010107/DH06/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :                           /   3.5
.E2    : 0901 :   /   3.4 /   3.3 /   3.3 /   3.2
.E3    : 0902 :   /   3.0 /   3.0 /   2.9 /   2.9
.E4    : 0903 :   /   2.8 /   2.7 /   2.7 /   2.7
.E5    : 0904 :   /   2.6 /   2.6 /   2.6 /   2.5
.E6    : 0905 :   /   2.5 /   2.5 /   2.4 /   2.4
.E7    : 0906 :   /   2.3 /   2.3 /   2.2 /   2.2
.E8    : 0907 :   /   2.2 /   2.1 /   2.0
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831                            /  0.00
: 0901    /  0.00 /  0.00 /  0.00
:
: 24-hr QPF Total Ending on Sep 02 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, VALI2
:VALLEY CITY, IL - LSX
:
:ACTION STAGE      11.0 FTMINOR STAGE       14.0 FT
:MODERATE STAGE    21.0 FTMAJOR STAGE       23.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 3.0 FT AT 0000 Z ON SEP 01
.ER VALI2 0901 Z DC202509010107/DH06/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :                           /   2.9
.E2    : 0901 :   /   2.9 /   2.9 /   2.8 /   2.8
.E3    : 0902 :   /   2.7 /   2.7 /   2.6 /   2.5
.E4    : 0903 :   /   2.4 /   2.4 /   2.4 /   2.3
.E5    : 0904 :   /   2.3 /   2.2 /   2.2 /   2.2
.E6    : 0905 :   /   2.1 /   2.1 /   2.1 /   2.1
.E7    : 0906 :   /   2.1 /   2.1 /   2.0 /   2.0
.E8    : 0907 :   /   1.9 /   1.9 /   1.8
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831                            /  0.00
: 0901    /  0.00 /  0.00 /  0.00
:
: 24-hr QPF Total Ending on Sep 02 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:************************************************************
:ILLINOIS RIVER, HARI2
:HARDIN, IL - LSX
:
:ACTION STAGE      24.0 FTMINOR STAGE       25.0 FT
:MODERATE STAGE    31.0 FTMAJOR STAGE       32.0 FT
:
:THE ESTIMATED RIVER STAGE WAS 20.0 FT AT 0000 Z ON SEP 01
.ER HARI2 0901 Z DC202509010107/DH06/HGIFF/DIH6
:RIVER FORECAST   /  12Z  /  18Z  /  00Z  /  06Z
.E1    : 0831 :                           /  20.0
.E2    : 0901 :   /  20.0 /  19.9 /  19.9 /  19.9
.E3    : 0902 :   /  19.9 /  19.8 /  19.8 /  19.7
.E4    : 0903 :   /  19.7 /  19.7 /  19.7 /  19.7
.E5    : 0904 :   /  19.7 /  19.7 /  19.7 /  19.7
.E6    : 0905 :   /  19.7 /  19.7 /  19.7 /  19.7
.E7    : 0906 :   /  19.7 /  19.7 /  19.7 /  19.6
.E8    : 0907 :   /  19.6 /  19.6 /  19.6
:
: ***THE TABLE BELOW IS THE QPF FOR THE LOCAL DRAINAGE
: AREA AND DOES NOT REPRESENT THE QPF FOR ANY UPSTREAM
: WATERSHEDS***
:
:QPF (IN)   /  12Z  /  18Z  /  00Z  /  06Z
: 0831                            /  0.00
: 0901    /  0.00 /  0.00 /  0.00
:
: 24-hr QPF Total Ending on Sep 02 is 0.00 inches
:
:FORECASTER COMMENTS...
:
:
:
:*******************************************************************
:
$$
:
FCSTR EXT: 2529
:
:...END of MESSAGE...